Notice on Submitting Technical Materials and Holding the Mid-term Review Meeting for the First Batch of Projects under the "National Engineering Laboratory"

Created:2011-01-18 16:00

"National Engineering Laboratory" First Batch of Project Initiatives

Notice on Submitting Technical Documentation and Holding the Mid-Term Progress Meeting

Project Leads:

To ensure the successful implementation and timely completion of the first batch of projects for the National Engineering Laboratory, NEL will hold a mid-term progress review meeting on 2011/1/4, with industry experts invited to evaluate the work. All project teams are requested to make necessary preparations in advance. The relevant matters are notified as follows:

1. Each project must submit detailed technical documentation (in WORD format), including: experimental basis for the study, detailed preparation process and route for reference standards, validation of the preparation process and scalability feasibility, structural confirmation and purity analysis data/spectra for reference standards, or research progress and interim results, by [date].2010Before 12/26 at 17:00Send to Teacher Wang Zhimin's email:zhmw123@263.net

II. Reference standards for the following projects have been prepared and are available starting today: 20–5 mg along with corresponding experimental documentation, to be submitted toAt Teacher Feng Weihong'sPlease complete the purity re-verification and submit the report promptly. Required experimental documentation includes: TLC validation (chromatographic conditions for 3 TLC development systems and color photos) and HPLC validation (column model, internal diameter, particle size, and length; mobile phase composition, ratio, and flow rate; detection wavelength; and HPLC chromatograms).

3. The mid-term project review meeting will be held at20111/4/14 at 00The meeting will be held in the conference room on floor 3 of the TCM Research Institute. Each project must prepare a presentation slide deck. The presentation time is 5–8 minutes. All projects are expected to attend punctually and avoid absence.

 

National Engineering Laboratory for Quality Control of Traditional Chinese Medicine

2010/12/21